Due to the size and weight of the Batch Plant structure, dynamic densification and piling were done as per the latest earthquake code requirements. 27 KB, approx. 6 seconds at 56.6Kbps |
|
State-of-the-art latest technology twin shaft mixers arriving to the plant prior to installation. They ensure optimum mixing of the very fast-setting concrete to be utilized in the IHI panels. 25 KB, approx. 6 seconds at 56.6Kbps |
|
Top view of the 300-Ton aggregate storage bin. Also shown is the truck unloading sand/gravel and the 65 ft. high elevator shaft that transports aggregates to the 4-compartment (75 Ton each) storage bin. 31 KB, approx. 7 seconds at 56.6Kbps |
|
Closeup of 14'x14'x16' deep pit for the aggregate loading hopper. 28 KB, approx. 6 seconds at 56.6Kbps |
|
Closeup of aggregate bin in sections prior to assembly. 23 KB, approx. 5 seconds at 56.6Kbps |
|
The three (200 Tons each) cement silos while being erected on-site. The 85-ft.-high silos provide cement to the two shaft mixers. 21 KB, approx. 5 seconds at 56.6Kbps |
|
Closeup of the scales under the aggregate bin. 35 KB, approx. 8 seconds at 56.6Kbps |
|
Under the aggregate bin state-of-the-art digital controls are used to measure the weight of aggregates and to probe moisture contents for optimum concrete mixing. 27 KB, approx. 6 seconds at 56.6Kbps |
|
The covered conveyor belt is clearly shown between the aggregate storage bin and the mixers section, which is located adjacent to the silos. 26 KB, approx. 6 seconds at 56.6Kbps |
|
Closeup of silo and mixer platform foundations. 24 KB, approx. 6 seconds at 56.6Kbps |
|
Closeup of steel support structure for silos and mixers platform. 27 KB, approx. 6 seconds at 56.6Kbps |
|