top_tour.gif (16KB)Hi Tech logo
.Building PartnershipsOnline Home ShowsBuild Your Own ProjectTour the FactoryIHI ManufacturingRequest More Information.

Tour the Factory: Manufacturing: May 2002



Update of the automated state-of-the-art concrete circulating and finishing plant equipment in production - May 2002.

CONCRETE CIRCULATING AND FINISHING EQUIPMENT
--
:Show image 'General View of Concrete Circulating Equipment' in New Window:
--
General View of Concrete Circulating Equipment
22 KB, approx. 5 seconds at 56.6Kbps
--
:Show image 'General View Of Concrete Circulating Equipment' in New Window:
--
General View Of Concrete Circulating Equipment
22 KB, approx. 5 seconds at 56.6Kbps
--
:Show image 'Three Stage Automated Helicopter Finishing System Show Below' in New Window:
--
Three Stage Automated Helicopter Finishing System Show Below
20 KB, approx. 5 seconds at 56.6Kbps
--
:Show image 'Panel ready to be placed in curing chamber shown in the background' in New Window:
--
Panel ready to be placed in curing chamber shown in the background
Each face requires only 4 hours of curing before the concrete is sealed
20 KB, approx. 5 seconds at 56.6Kbps
--
:Show image 'Road Panel - Stamping the Concrete' in New Window:
--
Road Panel - Stamping the Concrete
20 KB, approx. 5 seconds at 56.6Kbps
--
:Show image 'Panel ready to be turned and flipped' in New Window:
--
Panel ready to be turned and flipped
23 KB, approx. 5 seconds at 56.6Kbps
 

Legal Disclaimer | Home

Introduction
Manufacturing
Building
Factory
Photo Album
Visit Us
Home
.