top_tour.gif (16KB)Hi Tech logo
.Building PartnershipsOnline Home ShowsBuild Your Own ProjectTour the FactoryIHI ManufacturingRequest More Information.
oShow printable version of 'The first 80-foot span service roof truss' in a New WindowThe first 80-foot span service roof truss

 The first 80-foot span service roof truss being installed onto the wall panels at the east end of the factory. Mobile cranes and trucks are visible on the raised floor system (capacity 562 lbs/ft2).
--
:Show picture in New Window:
--
 
o

You can view the Previous Tour the Factory: Photo Album item: The first 10-ft x 40-ft wall panel being installed.

You can view the Next Tour the Factory: Photo Album item: Concrete being poured to an average thickness of 1"-1.25"

You can return to the main Tour the Factory: Photo Album page, or press the Back button on your browser.

Legal Disclaimer | Home

Introduction
Manufacturing
Building
Factory
Photo Album
Visit Us
Home
.