The production of the steel and EPS panel components at the R&D facility.
|

The panels in the new IHI factory, ready for concrete pouring and finishing with electrical conduits and junction boxes pre-installed.
|

Pouring concrete on one of the IHI Show Home ground floor panels, utilizing the newly-installed overhead cranes.
|

Coloured concrete is placed in the panels for the exterior patio prior to stamping.
|

The concrete for a total of 4,500 sq.ft. of panels is manually poured, placed and finished within 4 hours.
|

The windows, glass and roller shutters ready to be installed within the panels prior to shipping to BC Place Stadium.
|