Building of the Vancouver Show Home
|
Click for more pictures |
Hi-Tech Foundation - Traditional Foundation IHI demonstrated the ease of connecting the Hi-tech System foundation panels to a traditional poured foundation and will monitor the performance advantages of this thermally superior product. |
Click for more pictures |
The early stages of the first floor assembly including the integration of structural beams into the Hi-Tech system panels to span over 30 feet or more with heavy loads. |
Click for more pictures |
The second floor is attached with concealed bracket connections. |
Click for more pictures |
Any loads, including large room modules, can be pre-designed at a distance for on-site assembly with a combination of smaller cranes if a larger crane is not available or cannot access the lot. |
Click for more pictures |
Permanent Waterproofing |
Click for more pictures |
Remodeling A complete finished 1500 sq. ft. basement was added including a laundry
room that was originally on the top floor.� Bedrooms were enlarged and
large south-facing windows were added in the top floor bedrooms. |
Click for more pictures |
Assembling the Garage The garage was assembled at the 9/9/99 AGM in approximately 4 hours. |
Click for more pictures |
Electrical and Mechanical Connections for Demonstration Mechanical and electrical services were added or modified including
large openings and shafts. |